Exam PRINCE2-Agile-Practitioner Simulator Fee, PRINCE2-Agile-Practitioner Labs
Exam PRINCE2-Agile-Practitioner Simulator Fee, PRINCE2-Agile-Practitioner Labs
Blog Article
Tags: Exam PRINCE2-Agile-Practitioner Simulator Fee, PRINCE2-Agile-Practitioner Labs, PRINCE2-Agile-Practitioner Reliable Exam Online, Valid PRINCE2-Agile-Practitioner Braindumps, Upgrade PRINCE2-Agile-Practitioner Dumps
As you know, the first-classs quality always come with the first service. That is exactly what describe our PRINCE2-Agile-Practitioner exam materials. No only that our PRINCE2-Agile-Practitioner training guide can attract you for its best quality, but also you will be touched by the excellent service. If you have any question about our PRINCE2-Agile-Practitioner Learning Engine, our service will give you the most professional suggestion and help. And we work 24/7 online. So you can always find we are acompanying you.
PRINCE2 PRINCE2-Agile-Practitioner Exam Syllabus Topics:
Topic | Details |
---|---|
Topic 1 |
|
Topic 2 |
|
Topic 3 |
|
Topic 4 |
|
Topic 5 |
|
>> Exam PRINCE2-Agile-Practitioner Simulator Fee <<
New Exam PRINCE2-Agile-Practitioner Simulator Fee | Pass-Sure PRINCE2-Agile-Practitioner Labs: PRINCE2 Agile Practitioner Project Management Exam 100% Pass
We all know the effective diligence is in direct proportion to outcome, so by years of diligent work, our experts have collected the frequent-tested knowledge into our PRINCE2-Agile-Practitioner practice materials for your reference. So our PRINCE2-Agile-Practitioner training materials are triumph of their endeavor. By resorting to our PRINCE2-Agile-Practitioner practice materials, we can absolutely reap more than you have imagined before. We have clear data collected from customers who chose our PRINCE2-Agile-Practitioner actual tests, the passing rate is 98% percent. So your chance of getting success will be increased greatly by our PRINCE2-Agile-Practitioner materials.
PRINCE2 Agile Practitioner Project Management Exam Sample Questions (Q49-Q54):
NEW QUESTION # 49
Project scenario - Get fit with football!
(Note: The companies and people within the scenario are fictional)
Introduction
A Local Government Authority (LGA) has decided to organize a six-a-side football tournament. The tournament will contribute towards achieving the targets set by a national initiative to improve the fitness of children under the age of 16. As part of the LGA's policy of self-funding, this has to be achieved at zero cost to the LGA (and therefore the local tax payer). The cost of the event will be covered through fees paid by teams registered to take part in the tournament, sponsorship and monies raised during the day. Any surplus would be used for the maintenance of local sports centres.
Teams can register under one of several age groups for both boys and girls. In addition, family members are asked to attend to provide support.
This sports event is designed to be a family day out. The football tournament will have an event village including a kidz'-zone, catering, car parking, mobile changing rooms and toilets. The tournament will take place on the LGA-owned football pitches near the centre of the town, although space is somewhat limited.
Scope
The initial scope of the project includes:
a marketing campaign to promote the event;
a celebrity to open the event;
a website to provide information about the event and handle applications; an event village to support the 'family day out'; the training of LGA staff as volunteers to run and support the event; back-office processes to handle the applications; fundraising to cover the cost of the event.
The project has been set up with four work streams to deliver this work:
1. Marketing
2. Website
3. Event Village
4. Staff Training
Project Background
The LGA have extensive experience in using PRINCE2 and will run the event as a single project. The project manager is fully conversant with PRINCE2 Agile. One office in the LGA building in the centre of town has been given to the project for the entire duration. The office is across the corridor from the Marketing Department and the project manager has already put a sign on the door that says 'Mission Control'.
Timeline
An initial timeline has been suggested and is shown in the following diagram. The timeline may evolve due to the agile ways of working. The timeline shows how work streams are broken down into work packages and/or timeboxes.
Event Village - Additional information
The aim of the event village is to provide a range of services and activities for anyone attending the football tournament.
The event village will comprise a number of work packages:
1. Event village design
2. A 'kids-zone' which includes trampolines and swings, as well as the opportunity to try out other sporting activities
3. Stalls which will be sold to local businesses to raise funds for the event:
Refreshment stalls within a large food tent. The LGA is keen to promote the culinary diversity of the town whilst adhering to the objective of eating healthily.
There are 30 vendor stalls selling products related to the event.
The LGA has five stalls to promote their longer term aims and to demonstrate current and future initiatives.
4. A car park for 200 cars.
5. Temporary facilities including changing rooms, toilets and shower facilities.
6. Dismantling of the event village and clean up.
The Event Village Team is assembled using staff from various LGA departments who have no experience of working with agile.
Using the Project Scenario and Event Village Additional information, answer the following question:
The typical approach to planning taken by the Event Village team is for the plans to be developed by the project manager and the Event Village team manager, and then presented to the team.
Which setting on the Agilometer is the MOST appropriate to reflect this approach?
- A. Medium/High for 'level of collaboration' because the team manager has been involved throughout the planning process.
- B. Low/Medium for 'acceptance of agile' because the teams understanding of an agile way of working could be improved.
- C. Low/Medium for 'ease of communication' because this form of communication is too formal.
- D. Medium/High for 'ability to work iteratively and deliver incrementally' because of the use of the feedback loop involving the team.
Answer: B
Explanation:
Since the planning is primarily developed by the project manager and the Event Village team manager and then presented to the team, it indicates a lack of full team involvement in the planning process. This approach suggests that the acceptance and understanding of agile principles within the team could be improved, warranting a Low/Medium rating for 'acceptance of agile.'
NEW QUESTION # 50
Project scenario - Get fit with football!
(Note: The companies and people within the scenario are fictional)
Introduction
A Local Government Authority (LGA) has decided to organize a six-a-side football tournament. The tournament will contribute towards achieving the targets set by a national initiative to improve the fitness of children under the age of 16. As part of the LGA's policy of self-funding, this has to be achieved at zero cost to the LGA (and therefore the local tax payer). The cost of the event will be covered through fees paid by teams registered to take part in the tournament, sponsorship and monies raised during the day. Any surplus would be used for the maintenance of local sports centres.
Teams can register under one of several age groups for both boys and girls. In addition, family members are asked to attend to provide support.
This sports event is designed to be a family day out. The football tournament will have an event village including a kidz'-zone, catering, car parking, mobile changing rooms and toilets. The tournament will take place on the LGA-owned football pitches near the centre of the town, although space is somewhat limited.
Scope
The initial scope of the project includes:
a marketing campaign to promote the event;
a celebrity to open the event;
a website to provide information about the event and handle applications;
an event village to support the 'family day out';
the training of LGA staff as volunteers to run and support the event;
back-office processes to handle the applications;
fundraising to cover the cost of the event.
The project has been set up with four work streams to deliver this work:
1. Marketing
2. Website
3. Event Village
4. Staff Training
Project Background
The LGA have extensive experience in using PRINCE2 and will run the event as a single project. The project manager is fully conversant with PRINCE2 Agile. One office in the LGA building in the centre of town has been given to the project for the entire duration. The office is across the corridor from the Marketing Department and the project manager has already put a sign on the door that says 'Mission Control'.
Timeline
An initial timeline has been suggested and is shown in the following diagram. The timeline may evolve due to the agile ways of working. The timeline shows how work streams are broken down into work packages and/or timeboxes.
Website - Additional information
A new website will be built for the event. There are five work packages within this product:
1. Initial homepage:
Website showing the event details, competition rules, etc.
2. Team Registration functionality:
team name, player's names and ages;
contact information;
payment;
lunch pack requirements (includes any special dietary needs);
car parking requirements.
3. Social media promoting the event and its aims.
4. Applications (apps) to promote healthy lifestyles including fitness and healthy eating apps.
5. Health Park:
An online knowledge base about healthy lifestyles that includes a discussion forum.
The Website Team have a lot of experience in IT and have been using agile for several years. They are delivering the website through five two-week timeboxes. The team uses a Scrum Master to facilitate and the Scrum process and coach people accordingly.
The Website Team are very good at Scrum. They have created a set of tasks to assess more difficult work and they refer to this as sprint zero.
Using the Project Scenario and Website Additional information, answer the following question:
The project manager has asked the Scrum Master who will be leading the website work stream to act as team manager. The team manager will act as a single point of contact for the project manager, taking on the responsibilities of a team manager. The team manager will continue to coach and lead the Website Team.
Which BEST describes how this tailors the organization theme?
- A. Each person in the Website Team, including the Scrum Master, should be capable of performing multiple tasks.
- B. The Scrum Master should serve the Scrum team while taking on the responsibilities of a team manager.
- C. The project manager wants the Website Team to use fewer agile behaviours than they are currently using.
- D. There should only be one team in a small scale project with the Website Team taking on all of the delivery roles.
Answer: B
Explanation:
By having the Scrum Master act as the team manager, it emphasizes the role of the Scrum Master in supporting and serving the team while also managing the communication and responsibilities required by the project manager. This approach maintains agile principles while ensuring clarity in roles and responsibilities within the team.
NEW QUESTION # 51
Project scenario - Get fit with football!
(Note: The companies and people within the scenario are fictional)
Introduction
A Local Government Authority (LGA) has decided to organize a six-a-side football tournament. The tournament will contribute towards achieving the targets set by a national initiative to improve the fitness of children under the age of 16. As part of the LGA's policy of self-funding, this has to be achieved at zero cost to the LGA (and therefore the local tax payer). The cost of the event will be covered through feespaid by teams registered to take part in the tournament, sponsorship and monies raised during the day. Any surplus would be used for the maintenance of local sports centres.
Teams can register under one of several age groups for both boys and girls. In addition, family members are asked to attend to provide support.
This sports event is designed to be a family day out. The football tournament will have an event village including a kidz'-zone, catering, car parking, mobile changing rooms and toilets. The tournament will take place on the LGA-owned football pitches near the centre of the town, although space is somewhat limited.
Scope
The initial scope of the project includes:
a marketing campaign to promote the event;
a celebrity to open the event;
a website to provide information about the event and handle applications; an event village to support the 'family day out'; the training of LGA staff as volunteers to run and support the event; back-office processes to handle the applications; fundraising to cover the cost of the event.
The project has been set up with four work streams to deliver this work:
1. Marketing
2. Website
3. Event Village
4. Staff Training
Project Background
The LGA have extensive experience in using PRINCE2 and will run the event as a single project. The project manager is fully conversant with PRINCE2 Agile. One office in the LGA building in the centre of town has been given to the project for the entire duration. The office is across the corridor from the Marketing Department and the project manager has already put a sign on the door that says 'Mission Control'.
Timeline
An initial timeline has been suggested and is shown in the following diagram. The timeline may evolve due to the agile ways of working. The timeline shows how work streams are broken down into work packages and/or timeboxes.
Event Village - Additional information
The aim of the event village is to provide a range of services and activities for anyone attending the football tournament.
The event village will comprise a number of work packages:
1. Event village design
2. A 'kids-zone' which includes trampolines and swings, as well as the opportunity to try out other sporting activities
3. Stalls which will be sold to local businesses to raise funds for the event:
Refreshment stalls within a large food tent. The LGA is keen to promote the culinary diversity of the town whilst adhering to the objective of eating healthily.
There are 30 vendor stalls selling products related to the event.
The LGA has five stalls to promote their longer term aims and to demonstrate current and future initiatives.
4. A car park for 200 cars.
5. Temporary facilities including changing rooms, toilets and shower facilities.
6. Dismantling of the event village and clean up.
The Event Village Team is assembled using staff from various LGA departments who have no experience of working with agile.
Using the Project Scenario and Event Village Additional information, answer the following question:
All public events supported by the LGA must be fully accessible to all visitors.
How should this requirement be recorded?
- A. Under the composition heading of project product description as a Must Have requirement.
- B. In a user story: 'As the LGA, I want to allow access to all visitors so that everyone can attend the tournament'.
- C. In the project product description for the tournament as a Customer Quality Expectation.
- D. On a burn chart as a feature to be delivered by the team within the current timebox.
Answer: C
Explanation:
Recording this requirement as a Customer Quality Expectation highlights its importance to the overall success of the event. It ensures that accessibility is recognized as a critical aspect that the project must meet to satisfy stakeholders and attendees, aligning with the principles of inclusivity in public events.
NEW QUESTION # 52
Which BEST describes an agile method or approach that can be integrated with PRINCE2 Agile?
- A. Providing guidance on tailoring any applicable principles, themes and processes.
- B. Reducing quality testing in order to deliver within agreed deadlines.
- C. Encouraging system improvement through visualization and controlling work in progress.
- D. Favoring processes and tools over individuals and interactions.
Answer: C
Explanation:
This approach aligns with Agile principles, emphasizing continuous improvement and effective workflow management, which can complement the structured framework of PRINCE2 Agile.
NEW QUESTION # 53
Project scenario - Get fit with football!
(Note: The companies and people within the scenario are fictional)
Introduction
A Local Government Authority (LGA) has decided to organize a six-a-side football tournament. The tournament will contribute towards achieving the targets set by a national initiative to improve the fitness of children under the age of 16. As part of the LGA's policy of self-funding, this has to be achieved at zero cost to the LGA (and therefore the local tax payer). The cost of the event will be covered through fees paid by teams registered to take part in the tournament, sponsorship and monies raised during the day. Any surplus would be used for the maintenance of local sports centres.
Teams can register under one of several age groups for both boys and girls. In addition, family members are asked to attend to provide support.
This sports event is designed to be a family day out. The football tournament will have an event village including a kidz'-zone, catering, car parking, mobile changing rooms and toilets. The tournament will take place on the LGA-owned football pitches near the centre of the town, although space is somewhat limited.
Scope
The initial scope of the project includes:
a marketing campaign to promote the event;
a celebrity to open the event;
a website to provide information about the event and handle applications; an event village to support the 'family day out'; the training of LGA staff as volunteers to run and support the event; back-office processes to handle the applications; fundraising to cover the cost of the event.
The project has been set up with four work streams to deliver this work:
1. Marketing
2. Website
3. Event Village
4. Staff Training
Project Background
The LGA have extensive experience in using PRINCE2 and will run the event as a single project. The project manager is fully conversant with PRINCE2 Agile. One office in the LGA building in the centre of town has been given to the project for the entire duration. The office is across the corridor from the Marketing Department and the project manager has already put a sign on the door that says 'Mission Control'.
Timeline
An initial timeline has been suggested and is shown in the following diagram. The timeline may evolve due to the agile ways of working. The timeline shows how work streams are broken down into work packages and/or timeboxes.
Marketing - Additional information
The marketing campaign has two key areas to promote:
1. The event itself including the football tournament, event village and fundraising activities.
2. The LGA's long term aim to improve the fitness of children under the age of 16.
The Marketing Team has received some initial Scrum training but is unsure how it can be applied to their marketing work.
The Marketing Team is keen that the project manager provides them with a clear brief for the campaign before they spend too much time on it.
They have experience of working with a variety of marketing channels, although they are not sure which channel(s) will work most effectively to promote this type of event, and in particular to promote the LGA's longer term health aims.
The Marketing Team is not clear on the priority to assign to the two aims for the event.
The Marketing Team will publish advertisements and/or promotional material every week, with more information in each issue to keep the message up to date.
Nine releases are scheduled at the end of each of the nine week-long timeboxes.
The nine timeboxes within the marketing work stream are scheduled to include:
advertisements:
a radio interview;
production of a hand-out/flyer;
banners and signs to put up around the town and at the event;
the provision of a website and social media content;
promotional posters to be displayed by local businesses.
Using the Project Scenario and Marketing Additional information, answer the following question:
The Marketing Team is concerned that if local schools hold their annual fundraiser on the same day as the football tournament, this may cause attendance to be adversely affected.
The team manager has asked the business analyst to investigate this risk further and report back to the team at the next daily stand-up.
Which BEST explains how this approach manages risk?
- A. It is a poor approach because the team manager should carry out actions related to risks that may impact delivery.
- B. It is a poor approach because this risk is outside the project's control so it is NOT relevant to the Marketing Team.
- C. It is a good approach because discussions in the daily stand-up are a way to actively manage risk.
- D. It is a good approach because the business analyst is responsible for capturing the wider customer view.
Answer: C
Explanation:
The daily stand-up is an opportunity for the team to discuss ongoing issues, including risks. By having the business analyst investigate the potential conflict with the local schools' fundraiser and report back, the team can address this risk proactively and make informed decisions on how to mitigate it, thus managing risk effectively.
NEW QUESTION # 54
......
It is incontrovertible high quality and high accuracy PRINCE2-Agile-Practitioner practice materials that have helped more than 98 percent of exam candidates who choose our PRINCE2-Agile-Practitioner real quiz gets the certificate successfully. So we totally understand you inmost thoughts, and the desire to win the PRINCE2-Agile-Practitioner Exam as well as look forward to bright future that come along. During your practice process accompanied by our PRINCE2-Agile-Practitioner study guide, you will easily get the certificate you want.
PRINCE2-Agile-Practitioner Labs: https://www.realvce.com/PRINCE2-Agile-Practitioner_free-dumps.html
- Simulated PRINCE2-Agile-Practitioner Test ???? PRINCE2-Agile-Practitioner Sample Questions Answers ???? New PRINCE2-Agile-Practitioner Dumps Ebook ???? Simply search for 「 PRINCE2-Agile-Practitioner 」 for free download on 「 www.pass4test.com 」 ????Trustworthy PRINCE2-Agile-Practitioner Pdf
- PRINCE2-Agile-Practitioner Sample Questions Answers ???? PRINCE2-Agile-Practitioner Detailed Study Plan ???? Certified PRINCE2-Agile-Practitioner Questions ???? Easily obtain free download of ➠ PRINCE2-Agile-Practitioner ???? by searching on “ www.pdfvce.com ” ????Updated PRINCE2-Agile-Practitioner Demo
- Efficient PRINCE2 Exam PRINCE2-Agile-Practitioner Simulator Fee and Newest PRINCE2-Agile-Practitioner Labs ???? Enter [ www.prep4pass.com ] and search for ▶ PRINCE2-Agile-Practitioner ◀ to download for free ????Updated PRINCE2-Agile-Practitioner Demo
- Valid Test PRINCE2-Agile-Practitioner Testking ???? Updated PRINCE2-Agile-Practitioner Demo ???? New PRINCE2-Agile-Practitioner Dumps Ebook ???? Open website ➥ www.pdfvce.com ???? and search for ▷ PRINCE2-Agile-Practitioner ◁ for free download ????Updated PRINCE2-Agile-Practitioner Demo
- Reliable PRINCE2-Agile-Practitioner Test Sims ⏩ Trustworthy PRINCE2-Agile-Practitioner Practice ???? Valid Test PRINCE2-Agile-Practitioner Testking ???? Search for ➽ PRINCE2-Agile-Practitioner ???? and download exam materials for free through ▶ www.pass4leader.com ◀ ????Valid Braindumps PRINCE2-Agile-Practitioner Sheet
- Professional PRINCE2 Exam PRINCE2-Agile-Practitioner Simulator Fee Are Leading Materials - Trustable PRINCE2-Agile-Practitioner: PRINCE2 Agile Practitioner Project Management Exam ???? Enter ⮆ www.pdfvce.com ⮄ and search for 【 PRINCE2-Agile-Practitioner 】 to download for free ????Valid Test PRINCE2-Agile-Practitioner Testking
- New PRINCE2-Agile-Practitioner Mock Test ???? PRINCE2-Agile-Practitioner Review Guide ???? New PRINCE2-Agile-Practitioner Exam Labs ???? Enter ▛ www.exam4pdf.com ▟ and search for ⮆ PRINCE2-Agile-Practitioner ⮄ to download for free ????PRINCE2-Agile-Practitioner Online Lab Simulation
- Professional PRINCE2 Exam PRINCE2-Agile-Practitioner Simulator Fee Are Leading Materials - Trustable PRINCE2-Agile-Practitioner: PRINCE2 Agile Practitioner Project Management Exam ???? Go to website ⏩ www.pdfvce.com ⏪ open and search for ▷ PRINCE2-Agile-Practitioner ◁ to download for free ????Simulated PRINCE2-Agile-Practitioner Test
- Trustworthy PRINCE2-Agile-Practitioner Practice ???? PRINCE2-Agile-Practitioner PDF Download ⏏ PRINCE2-Agile-Practitioner PDF Download ???? Immediately open ⇛ www.examcollectionpass.com ⇚ and search for ▶ PRINCE2-Agile-Practitioner ◀ to obtain a free download ????PRINCE2-Agile-Practitioner Online Lab Simulation
- New PRINCE2-Agile-Practitioner Exam Labs ???? PRINCE2-Agile-Practitioner Detailed Study Plan ???? PRINCE2-Agile-Practitioner Detailed Study Plan ???? Open website ☀ www.pdfvce.com ️☀️ and search for ➤ PRINCE2-Agile-Practitioner ⮘ for free download ????Trustworthy PRINCE2-Agile-Practitioner Pdf
- Professional PRINCE2 Exam PRINCE2-Agile-Practitioner Simulator Fee Are Leading Materials - Trustable PRINCE2-Agile-Practitioner: PRINCE2 Agile Practitioner Project Management Exam ???? Search for 「 PRINCE2-Agile-Practitioner 」 and download it for free immediately on ✔ www.prep4away.com ️✔️ ????Reliable PRINCE2-Agile-Practitioner Test Sims
- PRINCE2-Agile-Practitioner Exam Questions
- 24hoursschool.com copyright-engineers.com kamailioasterisk.com learnonlineuganda.org www.bitcamp.ge web.cadtabs.com clavicons.com incomifytools.com temp9.henrypress.net app.hackersunskool.com